City of Highland Village: 2022 Street Improvement Project

Project Description

This project consists of streets to be improved as part of the 2022 Street Bond Program. These street improvements generally consist of full depth reclamation to existing asphalt roads and asphalt overlay. This project will be accomplished in several phases in an effort to more concentrate and limit the work to different areas of the City, one area at a time. The first phase included improvements to Glenmere Drive, Camden Drive, Turpin Drive, La Mesa Drive, Medina Drive, Catlin Circle, Catlin Terrace, Ranney Drive, Moran Drive, and Lakeland Drive. The second phase included Sandero Drive, Bexar Drive, Victoria Drive, Malibu Drive, Inca Place, Cuero Place, Perro Place, Medina Drive, Savanna Drive and Edgewood Drive. Phase 1 and 2 designs have been completed and construction was completed in 2024. The remaining phases 3 and 4 are still in design and are anticipated to be completed by 2026.